Day 10 We had to un-goose and luff up 20 degrees to keep clear of a ship
yesterday morning despite the skipper agreeing to pass to starboard of us.
While handling the sail, the sheath on the sheet partly stripped and
concertinaed up the core. We have a plastic tubes taped to the sheet at the
sail end which are there to protect the sheet from chafe at the pole but despite
many innovative attempts to eliminate it, it always slips in the end and the
sheet gets badly damaged and progressively shorter. Anyway once we were safely passed the ship, Matt tried to pull the
sheath back but could only get it so far as it was still through the pole. We
were left with an un-sheathed bit of around half metre. He sewed the sheath in
place at that point and re-taped the plastic tube to the end of the sheet and
we re-goosed. All of this was done up on the foredeck with seas of around 3m
– not an easy task! Hopefully that will last until we get to Rodrigues
where we can make a better repair. We continued with the genoa poled out for the rest of the day with
winds of around 18 – 20 knots but the seas never really reduced in size.
At around 10pm there was a wind shift and we un-goosed and sailed on a 2 sail
reach for a couple of hours before having to re-pole out the genoa. For the
first time on this passage we had squalls ranging from 10- 30k through the
night which gave us wind shifts of +/- 30 degrees and rain to wash some of the
salt off the boat! Not terribly comfortable as we had the waves on the beam
and other places quite a lot. We’re still poled out and have just negotiated another large bulk
carrier on its way to Date and time: 25th September 10.15 local (GMT + 6.5 hrs) Position: S19:29:321 E064:14:014 24 hours distance: 193 nm |